Why can't the transformer installation be far from the stone crusher production line
Reading volume:34 Release time:2023-10-23 16:51:49
Why can't the transformer installation be far from the stone crusher production line?
In the design and installation of the stone crusher production line, the installation distance of the transformer is a problem that can not be ignored, and many customers are ready to engage in stone crushing, his actual production site is a lot of blank, everything needs to start from scratch. When some customers are preparing to install the machine, they have also encountered the design according to normal ideas, often the existing transformer is too far away from the main engine of the stone crusher.
So why do you want to tell you today that the transformer can not be far from the stone crusher production line of Shandong Sanxiang Heavy machinery? First of all, the reasons for the lack of voltage in the actual process of the crusher production line are as follows:
First, many customers are based on the higher power wattage of the existing transformer as a reference to the configuration of the stone crusher production line, basically no surplus. The motor power configured is also just enough for the normal production and use of the machine, which means that if there is a little inappropriate factor, the main motor will not pull the operation phenomenon.
Second, many old transformer configuration of the main line is aluminum core, conduction function is much worse than the copper core, which will indirectly lead to power consumption, is the actual requirements of the machine operation of kilowatts simply can not reach, seriously will lead to the emergence of stone crusher crusher phenomenon, greatly affecting the use of the machine efficiency.
Third, many new sites in the design, want to save trouble to install the transformer in a convenient place to install, resulting in the transformer from the stone crusher production line host distance artificially elongated.
Fourth, even if the customer in the stone crusher production line at the time of the transformer capacity is rich, but in the actual production process, there are too many places for electricity and later possible production line transformation projects, before the design and installation must be taken into account together with the factors that may occur in the future.
Shandong Sanxiang Heavy Industry Co., LTD., when communicating with customers about how to set the transformer, the first requirement is that the installation distance of the transformer cannot exceed 60 meters, which will increase the loss of electric energy invisibly, and the direct result is that there will be insufficient kinetic energy of the main motor in the production process. Secondly, the main line of the transformer can not use aluminum core, must use copper core, so as to avoid the phenomenon of insufficient kinetic energy of the main motor to a greater extent. If the customer has a surplus of transformer volts, the distance exceeds 60 meters of the stone crusher host, the solution is to thicken the main line of the transformer, the fundamental purpose is to ensure the normal operation of the host motor.
This is Shandong Sanxiang Heavy Industry Co., Ltd. encountered in the actual design and installation of the transformer how to use the problem, if you have any new insights, welcome to call and communicate with us.
Whatsapp:+086-13969954956
Skype:+086-13969954956
Wechat:+086-13969954956
Phone:+086-13969954956
E-mail:lxtbruce0818@163.com