Why stone crusher production line should pay attention to soil removal operations
Reading volume:44 Release time:2023-11-06 15:59:48
Why stone crusher production line should pay attention to soil removal operations:
Everyone has played with soil as a child, a variety of play and enjoy it, I believe you also know the most basic feature of the figure, that is, the rain is easy to wither, stick to where it is not easy to get down. So next to enter the topic we want to talk about today, why in the actual production process, to Shandong Sanxiang heavy industry machinery production of crusher production line when conveying materials must pay attention to soil removal operations?
First of all: In accordance with the national environmental protection requirements, the relevant dust removal work will be carried out with water before the relevant crushing materials enter the main machine stone crusher mouth. If there is a lot of soil in the crushing material at this time, after the water is soaked, it will enter the inner cavity of the crusher, and it will touch all parts of the crusher, and stick to the hammer head will accelerate the wear speed of the hammer head; The leakage plate will block the leakage plate and affect the discharge speed; Paste onto the screen, it will affect the screening work of the circular vibrating screen and other screen bodies; Sticking to the belt conveyor will increase its transportation energy consumption. In short, the removal of soil is endless, and the efficiency of the entire stone crusher production line is obviously affected.
Secondly, if the high soil content in the material to be crushed is not treated, it will directly affect the product grade of the finished material produced by the stone crusher production line. This problem is well understood, the soil entering the machine mouth will eventually return to the final product in the form of fine material, the result is that there is soil everywhere, that is all soil, some mixed with machine-made sand, some attached to the surface of the stone, the whole product looks dirty, at least visually not very comfortable.
Third, if the soil is not removed, it will bring a lot of unnecessary trouble to the sanitation and cleaning work of the stone crusher production line. Because the clay sticks everywhere, the accumulation of more in one place will be like squeezing toothpaste everywhere, and a little attention will stick to the shoes of the machine inspectors, clothes, which is very annoying, and the sanitation and cleaning personnel need to clean the clay down all the time, increasing the work burden.
Fourth, a lot of clay has a corrosive chemical composition, will bring great trouble to the use of related parts of the stone crusher, reduce its service life is on the one hand, a lot of clay will be damaged because of long-term adhesion, thereby increasing the maintenance cost of the machine, from this point of view, it is necessary to cause enough attention to the line, after all, it is real money bought.
Fifth, from the perspective of environmental protection, processing materials containing too much soil is indeed not conducive to the development of environmental protection work in the later period. No matter how good the dust removal system you are equipped with, if you are always in a full load working state, its effect will be greatly reduced. In the production of materials with high soil content, generally when the stone crusher is turned on for production, there will be a phenomenon of dust flying in the sky, and the fog will be the same from a distance, not to mention environmental protection and economic benefits and other issues, that is, people working in this environment is also harmful and large, long-term work is unbearable.
To sum up, Shandong Sanxiang Heavy Industry Co., Ltd. to the majority of customers is to carry out the stone crusher production line work, must pay attention to the soil removal work to be broken materials, otherwise it is a lot of harm, light will affect the efficiency of the crusher and the service life of related machine parts, heavy will harm the physical and mental health of workers, environmental protection effect, so we must pay attention to it.
Whatsapp:+086-13969954956
Skype:+086-13969954956
Wechat:+086-13969954956
Phone:+086-13969954956
E-mail:lxtbruce0818@163.com